Proper management of worksite generator is crucial for construction safety and productivity. Some precautions during operation can ensure the reliable performance of the construction site generators.
1. Pre-Operation Inspection
Verify all worksite generator components including fuel lines, coolant levels, and battery terminals before ignition. Check for oil leaks or corroded electrical connections that may cause hazardous malfunctions.
2. Load Management
Gradually increase electrical load on the worksite generator, avoiding sudden power surges. Distribute equipment usage evenly across phases for three-phase units. Never exceed 80% of rated capacity for prolonged periods.
3. Environmental Adaptation
Position the worksite generator on level ground with minimum 2-meter clearance from combustible materials. Use weatherproof enclosures in rainy conditions to prevent water ingress into control panels.
4. Maintenance Protocols
After shutdown, allow the worksite generator to cool before refueling. Schedule weekly air filter cleaning and monthly spark plug inspections. Maintain detailed service logs including runtime hours and part replacements.
5. Emergency Preparedness
Keep Class B fire extinguishers near all worksite generator installations. Train personnel in emergency shutdown procedures and carbon monoxide poisoning response for indoor installations.
Implementing these measures optimizes worksite generator efficiency while mitigating operational risks across construction phases.
More information about worksite generator:https://huaquanpower.com/